Imperial Collegei-Lab

A room featuring a table surrounded by chairs, with a desk and computer setup against the wall. The space is designed as an office with various pieces of furniture, including an office chair, and includes a ceiling overhead.
A room featuring a table surrounded by chairs, with a desk and computer setup against the wall. The space is designed as an office with various pieces of furniture, including an office chair, and includes a ceiling overhead.
A wooden table surrounded by chairs in a cozy room, with a large mirror on the wall, a window letting in natural light, and decorative elements that create an inviting atmosphere.
Key Contacts
  • Gareth Sinnamon
  • Ben Shelbourne
Imperial College i-Lab South Kensington

Lab refurbishment for world-leading research university completed

Stace was appointed on two projects for Imperial College London’s South Kensington campus.

Lab refurbishment for world-leading research university completed

The first project involved relocating the Department of Infectious Diseases from the St Mary’s Campus to the Sir Alexander Fleming Building. The refurbishment involved creating new Containment Level 2 (CL2) labs, a Containment Level 3 (CL3) lab suite an additional five labs, new offices, teaching space, and common areas across five levels, totalling approximately 3,200 sqm.

Regular coordination and logistics meetings were required to ensure the building could remain operational throughout construction and a dedicated external gantry and hoist were installed for accessing and moving materials.

Integrating CL3 and CL2 labs into a live building which had not been designed for this purpose, was a complex and challenging process. Extensive onsite design coordination and major design interventions were required, including creating new risers, running services externally to the building, constructing a new plant deck, and using crane lifts over other buildings to install plant equipment.

Refubishing i-Lab space

The second project involved the refurbishment of the university’s i-Lab space within their Chemistry Building.

Construction works lasted seven months and were completed to a high standard, achieving both end-user and client satisfaction, aided by the site team taking a proactive approach to manage engagement between the project team and users of the space. The building remained operational throughout the construction period, with minimal disruption to users.

Stace provided Employer’s Agent and Project Management services on both projects.
Key Contacts
Summary
  • Project Imperial College i-Lab
  • Sectors
    • Education
    • Life Sciences
  • Client Imperial College London
  • Size 181 sq m
  • Value £1.5m
  • Services
    • Employer’s Agent
    • Project Management