Background

The part demolition of two exisiting school and the phased construction of a new two storey Inclusive Learning Campus for 420 mainstream and 100 children with special needs. The first of its kind in the UK. The works are being completed in three phases including the adaptation of existing school buildings to suit the phasing and decanting of the children. An “Excellent” BREEAM rating isd required. The building is of about 5,925m² and includes a hydrotherapy pool and other specialist facilities for children with special needs. Externally there are 14,500m² of hard and soft landscaping including a water feature, an amphitheatre and soft play areas.